Afbeelding1

33,421 m² Logistics in Bleiswijk

Available for development

Plot

 

40,528 m²

Warehouse

 

29,637 m²

Mezzanine

 

2,268 m²

Office

 

1,516 m²

Available

 

Q1 2026

Development

This development is part of The Urban Logistics Campus A12, which is located in Bleiswijk. Bleiswijk is one of the fastest growing hotpots in the Netherlands and the campus stretches over 330,000 sqm with existing and new developments available from 10,000 sqm up to 150,000 sqm. Located at the East side of the park, building #4 Weble will be developed, according to the latest Next Level standards, providing an efficient and comfortable working climate for your business and your employees. The building will be delivered as a turn key solution that can be tailored individual requirements. The baseline building setup will consist of 2 units that can be leased as seperate units or as one site with warehouse, offices and mezzanine totaling 33,149 sqm.

Dimensions

DescriptionUnit 1Unit 2Total
Warehouse / Expedition14,692 m²14,675 m²29,367 m²
Mezzanine1,135 m²1,133 m²2,268 m²
Office758 m²758 m²1,516 m²
GLA16,585 m²16,566 m²33,151 m²
Site40,500 m²

Technical Specifications

Warehouse/Expedition
Free height: 12,2 m1 (Maximum storage height 12,1 m1)
Grid structure12x22,8 m1
Lighting systemStorage area: LED lighting 150 lux and expedition area: 250 lux;
Power socketsAmple AC power 230V and 400V;
Heating systemRadiant heating panels;
Sprinkler systemCertified ESFR with fire alarm and smoke detection;
Fire regulationFire compartments in line with local regulations
Floor load capacity4.000 kg/m2
Point load capacity 6.000 kg
Sustainability BREEAM-NL certificate, qualification ‘Very Good’
Loading docks 14 + 14 docks
Dock shelters3500 mm x 3500 mm with bumpers and wheel guide alignment systems
Specifications truck yardMinimum 35m1 deep with concrete loading pit in front of the gates
On-grade door1 Electric On-grade door 4000 mm x 4500 mm per Unit
Groundlevel doors2 + 2
DoorsElectric overhead doors
Mezzanine
Free height under mezzanine5,2m1
Depth mezzanine12m1
Location Above loading docks
Floor load capacity 600kg/m2
Office
SetupSeparate office per unit
ConfigurationShell - State offices ready for tenant fit - out
Inner free heightMinimum 2,7 m
Floor load capacity400 kg/m2
Heating systemVRF ceiling system (cooling & heating)
Ceiling and lighting systemSuspended ceiling with light fixtures 400 lux
Power cabeling and outletsAmple power sockets and provisioning for data cabling
Sanitary unitsAmple male and female toilet facilities in each unit equipped with hand bassins fixed into vanity units, mirrors and ceramic tiles upon 2m1 height
Site
Car parking spaces 187
Truck parking spaces T.b.d.
Bicycle shed3
Yard setupFully fenced property, paved site and landscaping
Lighting systemOutdoor lighting 15 lux

Plan Development

Location

The site is ideally situated in the A12 corridor in the center of the Dutch metropole area between Amsterdam, Rotterdam, The Hague and Utrecht. The Campus is in close proximity of the motorway A12, international airports, inland rail and barge terminals. This makes the campus the ideal centercourt for e-fulfillment, retail ans food logistics in The Netherlands.

Ready to discuss the possibilities? LET'S TALK
Back