Briefing
The masterplan for the site in Sittard required additional space for production, storage of temperature controlled ingredients and bulk storage for finished product.
Solution
A two stage plan was developed on the selected 2 brownfield locations, connecting the 2 plots to the existing manufacturing site and creating a modular future proof facility.
Result
The existings old buildings in use where re-developed into a new XXL state-of-art warehouse and production building. The development took place in 2 phases to secure the continuity of the 24/7 operation.